SECI Issues RfS for 1200 MW Wind-Solar Hybrid Power Projects Updated On Wed, Jan 2nd, 2019 by Saurenergy The maximum tariff payable to each WPD is fixed at Rs 2.85/kWh for the entire term of 25 years. State-owned Solar Energy Corporation of India (SECI) has issued Request for Selection (RfS) document for setting up of 1200 MW ISTS connected wind power projects (Tranche-VI) on “Build Own Operate” basis. This 1200MW solar-wind hybrid tender […] Read more
Bids for setting up of Wind Power Projects of over 8000 MW Capacity Finalised Updated On Thu, Dec 27th, 2018 by Saurenergy The wind power projects in the country are installed on the basis of commercial viability through tariff based competitive bidding process. As on date, the bids for setting up of wind power projects of aggregate 8389.90 MW capacity have been finalised through Solar Energy Corporation of India Ltd. (SECI) and National Thermal Power Corporation Ltd. […] Read more
Results of E-Bidding and E-RA for 1200 mw ISTS-Connected Wind Power Projects (Tranche-v) Updated On Sat, Oct 27th, 2018 by Saurenergy SOLAR ENERGY CORPORATION OF INDIA LIMITED Selection of 1200 MW ISTS-connected Wind Power Projects (Tranche-V) (RfS No: SECI/C&P/WPD/1200MW/T5/RfS/022018 dated 30.06.2018) After Technical Bid Opening After e-Reverse Auction (held on 25.09.2018) Sl. No. Bidder’s Name Capacity (MW) Bidder’s Name Bidder’s Quantity (MW) Tariff (INR/kWh) Awarded capacity (MW) 1 Alfanar Company 300 Torrent Power Limited 115 2.76 […] Read more
India’s First ISTS connected Wind Power Project Commissioned Updated On Fri, Aug 24th, 2018 by Saurenergy Government’s plan of 175 GW RE by the year 2022 Solar Energy Corporation of India Limited (SECI) conducted India’s first auction of wind power projects in February 2017 in which tariff of Rs. 3.46 was discovered, which was much lower than feed in tariffs in vogue those days. This was a 1000 MW bid for […] Read more
Govt Extends Transmission Charge Waiver Period for Solar Projects Till March 2022 Updated On Mon, Feb 19th, 2018 by Saurenergy The waiver will be available to these projects for 25 years from the date of commissioning provided the developers sign power purchase agreements with entities, including discoms, for sale of power for compliance of their renewable purchase obligation. The government has extended the window to avail waiver of inter-state power transmission charges and […] Read more
RFS FOR SETTING UP OF 2000 MW ISTS-CONNECTED WIND POWER PROJECTS (TRANCHE-IV) Updated On Mon, Feb 5th, 2018 by Saurenergy RfS for setting up of 2000 MW ISTS-connected Wind Power Projects (Tranche-IV) has been uploaded on the TCIL website. Tender Search code: SECI-2018-TN000010 RfS Document Read more
Guidelines issued for procurement of wind power through tariff based competitive bidding process Updated On Tue, Dec 12th, 2017 by Saurenergy Government has issued Guidelines under Section 63 of the Electricity Act, 2003 providing a framework for procurement of wind power through a transparent process of bidding including standardisation of the process and defining of roles and responsibilities of various stakeholders. These Guidelines aim to enable the Distribution Licensees to procure wind power at competitive rates […] Read more
India gets Lowest Wind Tariff of Rs. 2.64 per kWh in second Wind Auction of 1000 MW Updated On Thu, Oct 5th, 2017 by Saurenergy The wind tariff in India touched lowest level of Rs.2.64 per kWh in the second wind auction conducted by the Solar Energy Corporation of India (SECI) on behalf of Ministry of New & Renewable Energy, Government of India yesterday. The tariff discovered is much lower than first wind auction concluded at Rs. 3.46 per kWh […] Read more
Record Capacity Addition of Wind Power of 5400 MW in Last Fiscal Updated On Wed, Apr 12th, 2017 by Saurenergy Ministry of New and Renewable Energy (MNRE) has set another record in the wind power capacity addition by adding over 5400 MW in 2016-17 against the target of 4000 MW. This year’s achievement surpassed the previous higher capacity addition of 3.423 MW achieved in the previous year. The leading States in the wind power capacity […] Read more